Twese Hamwe 2011
Rwanda
Follow-up of the project
Images
Visit of the project 2012


 

 


CAPTURING AND EVACUATION OF RAIN WATER TO 2 10.000 LITER TANKS

I. Introduction

The huge amount of rain water, coming from the roofs of our buildings (surface 500m2) is causing big problems!   
At one side, this water is damaging our buildings, and at the other side it would e very beneficial
to use it for our projects (vegetable garden, project ‘colouring of tissues’, the garden).
Therefore we request help to be able to capture the rain water in 2 tanks (10.000 liter per tank).

II. Material

A) Weld-material in metal

Article

Amount

Unit price

Total

1

Metal gutters

62

10.000

620.000

2

Bars

21kg

1.500

31.500

3

Cement

10kg

12.000

120.000

4

Metal tube 60/40

6

10.000

60.000

5

Screws Ø 12

2kg

4.000

8.000

6

Evacuation tools

6

2.000

2.000

S/Total                                        841.500

B) Tubes (galvanised and PVC)


Article

Amount

Unit price

Total

1

Tubes PVC Ø 110

30

12.000

360.000

2

Elbow PVC Ø 110

24

3.000

72.000

3

Turn PVC Ø 110

10

2.800

28.000

4

Adhesive tangit

5kg

7.500

37.500

5

Joins PVC 110

60

1.200

72.000

6

Nails Ø 8

2kg

1.500

3.000

7

Hang wire

4kg

1.200

4.800

8

Tab Ø 1

2

10.000

20.000

9

Galvanised  coating 1

6

1.000

6.000

10

Galvanises niple Ø 1

20

1.200

24.000

11

Galvanised tubes  1

6

20.000

120.000

12

Galvanised elbow  1

20

1.000

20.000

13

Teflon

40

  300

12.000

14

Té PVC 110

8

3.000

24.000

SUBTOTAL

                803.300

C) Hanging and construction of supports

Article

Amount

Unit price

Total

1

Zavel

Truck x 2

50.000

100.000

2

Moellons

Truck x 2

45.000

90.000

3

Concrete iron Ø 12

32

9.000

288.000

4

Beams

32

1.800

57.600

5

Disks to cut

4

2.000

8.000

6

Nails Ø 6

3kg

1.500

4.500

7

Nails Ø 8

3kg

1.500

4.500

8

Iron wire

9kg

1.500

13.500

9

Cement

30 bags

10.000

300.000

10

Stirrup

60

1.000

60.000

11

Tank

2

920.000

1.840 .000

12

Protecting latticework

2 rols

40.000

80.000

Transport of the material

                   150.000

Working hours

                   300.000

Unforeseen expenses

                   100.000

Subtotal

              3.396.100

OVERALL TOTAL

             5.040.900

Top


Follow-up of the project

REPORT  : EVACUATION RAIN WATER/ PLACING WATERTANKS

1. THE WORKS

The First purchases were done on 18/3/11. 
Start of works :  21/3. 
End of works:  20/4/2011.

This project gave work to:

a)  Mow work and placing gutters  (120m): 5 persons         
b)  Bricklaying and placing tanks : 5 persons
c)  Plumbing :  2 persons
 
2.  EXPENDITURES

DATE

N° EVIDENCE

DESTINATION

AMOUNT

18/03/11

N° 1

Purchase material

1.672.000

31/03/11

N°2

Purchase material

714.500

22/03/11

N°3

Purchase material

1.600.000

25/03/11

N°4

Purchase sand

105.000

28/03/11

N°5

Purchase bricks

120.000

30/03/11

N°6

Additional material

73.000

01/04/11

N°7
N°8

Labour hours
additional material

154.000
73.600

09/04/11

N°9
N°10

Labour hours
Labour hours

280.000
93.500

13/04/11

N°11

Labour hours

120.000

19/04/11

N°12

Labour hours

36.000

TOTAL                                                                                                           5.041.600

3.  THANKS DECLARATION

The centre thanks the association "Vleugels van Hoop" for always offering a listening ear.. The project "recuperation of rain water" comes on top of the primary set objective of protecting the buildings. On top our current water costs are negligible!! (1.200 RwFr instead of 8.000).
An extra benefit on top of the already realized canalisation project in the centre.

Again a big THANK YOU to VLEUGELS VAN HOOP

Top


Visit on january 19 - 2012

On Thursday, 19.01.2012. Bernadette, the responsible of ‘Twese Hamwe’ receives us for a visit at the centre. This cultural centre is doing extremely well.

They started with a training:

The implementation of the project 'rainwater' is 100% completed and very useful.
The water bill decreased by ¾ of the costs. Bernadette presents us the Madam, who will succeed her. To our great surprise Bernadette is already 69 years old. It is not to be seen. Lunch is served by the first year students, let’s say students of the first days - the school begins here early January! Gifts are exchanged and we give the students an applause for the tasty meal and the excellent service!!